Infrastructure Support

The various SCRF test facilities being built at Fermilab (Vertical Test Stand, Horizontal Test Stand, and ILCTA at New Muon Lab) require significant infrastructure support. This support includes cryogenic systems that have the capability of cooling components to 2 Kelvin, Low Level RF control systems capable of meeting the ILC design requirements, 1.3 GHz RF power systems, and state of the art controls and instrumentation systems. These test facilities serve as a test-bed for the development, and continual advancement, of the technology necessary to design the advanced level of support systems required by the ILC.